The iron, the tonnage, and the bid.
Everything an estimator normally has to phone in and ask for: what we run, what scale we handle, how a bid gets built, and the standards we hold ourselves to.
- Fleet
- 22 machines
- Field crews
- 4
- Bonding capacity
- $3M
- Bid turnaround
- 5 business days
Twenty-two machines. All ours.
No rental calendar, no waiting on a dealer to free up a dozer. If a machine goes down mid-job we swap it out of our own yard the same day.
-
22
Machines
-
4
Lowboys
-
0
Rentals
Excavators
5 lines- Tracked excavator, 36 ton Weight 79,400 lb Bucket 5.5 yd³ Mass cut, rock, deep utility
- Tracked excavator, 22 ton Weight 48,500 lb Bucket 2.1 yd³ Basements, trunk lines, ponds
- Tracked excavator, 13 ton Weight 28,700 lb Bucket 1.1 yd³ Footings, laterals, general dirt
- Mini excavator, 3.5 ton Weight 7,900 lb Bucket 0.3 yd³ Backyards, gate access, hand-dig relief
- Micro excavator, 1.7 ton Weight 3,800 lb Bucket 0.1 yd³ 30-inch gates, crawlspaces, interiors
Dozers & loaders
4 lines- Dozer, D6-class Weight 45,200 lb Bucket GPS blade Mass grading, road prime, balancing
- Dozer, D4-class Weight 19,800 lb Bucket 6-way blade Pad finish, fine grade
- Wheel loader, 3 yd³ Weight 31,000 lb Bucket 3.0 yd³ Rock, stockpile, truck loading
- Compact track loader Weight 10,600 lb Bucket 0.7 yd³ Flatwork prep, forks, brush cutter
Haul & compaction
5 lines- Articulated haul truck Weight 25 ton payload Bucket — On-site cut-to-fill haul
- Tandem dump trucks (3) Weight 12 yd³ each Bucket — Import rock, export spoils
- Lowboy & tilt trailers Weight 40 ton capacity Bucket — Self-mobilizing, no rental waits
- Smooth drum roller, 5 ton Weight 11,300 lb Bucket — Subgrade & base compaction
- Trench compactor / jumping jack Weight — Bucket — Lift compaction in utility trench
Concrete & attachments
5 lines- Ride-on power trowel Weight — Bucket — Shop and warehouse slab finish
- Laser screed & roller screed Weight — Bucket — Flat-floor tolerance on large pours
- Hydraulic breaker, 3 sizes Weight — Bucket — Concrete, asphalt, basalt shelf
- Compaction wheel & plate Weight — Bucket — Trench backfill without over-digging
- Grapple, thumb, rippers Weight — Bucket — Demo sorting, stump grubbing
What a job this size actually looks like.
Real ranges from our last three years of work — so you can sanity-check a budget before you ever pick up the phone.
-
Single-family lot
01600 – 2,400
yd³ moved
Strip, cut the pad, dig footings, set the lateral, backfill and finish grade. Usually one crew and two machines start to finish.
3 – 8 working days- Pad to ±0.10 ft
- Lateral + storm
- Driveway subgrade
-
Multi-lot subdivision
028,000 – 30,000
yd³ moved
Mass balance across the plat, road prism and rock, joint utility trench, and pads released to the builder in phases so framing never waits.
6 – 16 weeks- GPS machine control
- Phased release
- Third-party density
-
Commercial pad & parking
034,000 – 18,000
yd³ moved
Building pad, underground detention, fire and domestic water, storm treatment, curb subgrade and heavy-duty base section.
4 – 10 weeks- Detention & treatment
- Fire line
- Heavy-duty base
-
Shop, barn & RV slab
04800 – 6,500
ft² poured
Compacted rock section, thickened edges, 5–6 inch slab with fiber or mesh, saw-cut joints and a sealed, dust-free finish.
5 – 12 working days- 6" over 8" rock
- Fiber or #4 mesh
- Cure & seal
-
Driveway replacement
05600 – 2,000
ft² poured
Break out and recycle the old slab, rebuild the base, form and pour 5 inches, then joint it on a grid that actually controls cracking.
3 – 6 working days- Old slab recycled
- 5" pour
- 10–12 ft joints
-
Demolition & clearing
061 – 12
structures / acres
Disconnects, permits, structure down, foundations out, loads sorted for recycling, lot left rough-graded and seeded if you want it.
2 days – 3 weeks- Permit pulled
- Loads sorted
- Rough-grade out
Five days, five steps, one number.
Written the way we run it, not the way it sounds good in a brochure. If any step is going to slip, you hear about it before the deadline, not after.
- 01 You
Send documents
Civil sheets, geotech, plat or plot plan, and any schedule constraints. PDFs are fine. If it's a residential job, three photos and a tape measurement will do.
Turnaround
Acknowledged same day
- 02 Basalt
Site walk & takeoff
An estimator walks it — grades shot, soil checked, access measured, spoil and import assumptions written down instead of guessed at.
Turnaround
Within 2 business days
- 03 Basalt
Line-item proposal
Yardage, truckloads, rock tonnage, concrete yards, permits, testing and mobilizations — priced separately so you can see what moves when scope moves.
Turnaround
Day 5, in writing
- 04 Together
Scope review call
Twenty minutes to walk the exclusions and the assumptions. This is where the change orders get killed before they exist.
Turnaround
Before award
- 05 Basalt
Schedule & mobilize
Signed dates on your calendar, submittals and certs to your PM, machines on a lowboy. Daily photo log for the whole duration.
Turnaround
Dates held in writing
Prequal packet
Everything a GC's compliance desk asks for, already assembled. Ask and it's in your inbox the same day.
- W-9 and Oregon CCB verification
- Certificate of insurance, additional-insured endorsement
- Payment & performance bond capacity to $3M
- EMR letter and OSHA 300 logs, three years
- Written safety program & competent-person roster
- Three builder references with current phone numbers
Standards we hold
These are minimums, not targets. If a plan calls for more, the plan wins.
- Compaction
- 95% of modified proctor, structural fill
- Pad tolerance
- ±0.10 ft over the building footprint
- Slab concrete
- 3,500 psi min · 4,000 psi shops & drives
- Rebar
- #4 @ 18" o.c. or engineered mat per plan
- Base rock
- 3/4"-minus, 6–8" compacted, geotextile as required
- Trench backfill
- 12" lifts, compacted, no jetting
- Joint spacing
- 24–30× slab thickness, saw-cut within 12 hrs
- Testing
- Independent lab, reports to owner & jurisdiction
Ground conditions
Willamette clay, river rock,
and the basalt shelf.
Seventeen years in this valley means we've already hit whatever is under your lot. Wet winter clay, cobble at four feet, a basalt shelf that eats a bid — we price for it up front, and the breaker is already on the trailer.